Concession for recovery work
Introduction
Concession for recovery work on land held under the Conservation Act, in a wildlife sanctuary or refuge, or in a reserve managed by DOC.The Orders in Council allow Waka Kotahi and KiwiRail to apply for concessions on certain lands using a truncated application process, for recovery works.
Agencies need to comply with the conditions set out in Schedule 4 to the Orders in Council. These conditions prescribe requirements for:
- avoidance, remediation, and mitigation of adverse effects
- development and certification of an earthworks and construction management plan and site rehabilitation plan
- a written summary of all works to be provided to DOC two months after construction works are completed. The summary must include:
- a general description of the works undertaken
- location of the works
- maps of the works
- designs of any structures erected in waterways.
The application process for concessions includes:
- concession application forms
- reporting on iwi consultation undertaken in relation to the proposed recovery work. This report must include:
- the names and contact details of Māori entities the Agency engaged with
- the names of entity representatives who attended the meetings, and the dates of those meetings
- a summary of the meeting discussions, including any concerns raised about the potential adverse effects of the proposed recovery work on taonga species known or predicted to be in the area
- the Agency’s responses to any concerns raised.